рус / eng / kaz    



Projects

RG GOLD
Tailing dam
1,200,000 sq.m.
since 2021


CARAVAN RESOURCES
Heap leach pad
700,000 sq.m.
since 2017


POLYMETAL





Tailing dam
1,600,000 sq.m.
since 2017


KAZMINERALS
AKTOGAY / BOZSHAKOL

Heap leaching pad.
2,000,000 sq.m.
since 2014

UMP
Tailing dam. Evaporation pond.
2 000 000 sq.m.
since 2006

Pavlodarenergo
Ash dam site.
3 000 000 sq.m
since 2014

China Gold 
Tailing dam
Kyrgyzstan
200 000 sq.m
2018


BOTANICAL GARDEN
Decoratice pond
Nur-Sultan
80 000 sq.m
2015 



: 611
: 06.04.2022



   




©2021 All rights reserved




please wait...

Хорошая погода, не так ли?

subscribe


operation success